淮北煤炭基地朱仙庄矿,设计能力为年产120万吨,主井净径5.5米,井深541.6米,安装一台3.25 X 4型多绳轮绞车提升,井塔系钢筋混凝土箱形肋板结构,共计8层,全高62米。49.5米楼层为绞车大厅,截面为 16.2×12.2米。井塔建筑体积为12000米~3,塔体连同托盘和塔内部分设备总重约4000吨。该井塔采用预建整移新工艺,于1981年10月27日凌晨1点55分已安全地整移到井口永久基础位置,整移距离为34.8米。
Zhu Xianzhuang coal base in Huaibei, design capacity of 1.2 million tons an annual output, the main shaft diameter of 5.5 meters, well depth 541.6 meters, the installation of a 3.25 X 4 multi-rope winch to enhance the tower tower reinforced concrete box rib structure, A total of 8 layers, the total height of 62 meters. 49.5 meters for the winch hall floor, section of 16.2 × 12.2 meters. Well tower construction volume of 12000 m ~ 3, together with the tower and the tower tower, some of the total weight of about 4,000 tons of equipment. The well tower using pre-built whole new technology, at 1:55 on October 27, 1981 has been safely moved to the permanent wellhead base, the displacement of 34.8 meters.