菏泽黄河河段位于山东黄河最上游,河道长185公里,堤防155.9公里,共有险工12处,控导工程17处、顺堤行洪防洪工程2处,引黄涵闸9座,总设计流量405立米每秒。该河段正处于“豆腐腰”位置,工程多、战线长、滩区大,迁安救护任务重,防汛抢险压力大。特殊的地理环境,决定了菏泽黄河防洪工程的重点和特点。主要表现为:一是,工程多、滩区大,抢险任务重;二是,滩区群众迁安救护任务艰巨,由于洪
The Heze Yellow River reaches the upper reaches of the Yellow River in Shandong Province. The river is 185 kilometers long and the embankment is 155.9 kilometers long. There are 12 dangerous workers, 17 control projects, 2 flood control and flood control projects, 9 flood control sluices and a total design flow of 405 meters Every second The river is in the “tofu waist ” position, many projects, long lines, beach area, Qian’an rescue tasks, flood prevention and rescue pressure. Special geographical environment, decided Heze Yellow River Flood Control Project focus and characteristics. Mainly as follows: First, many projects, floodplains, rescue tasks heavy; Second, the beach area people’s rescue task ambitious due to flood