论文部分内容阅读
一、蟹池建造 每池4-6亩,正方形或略呈长方形,距岸4-5米,做投饵平台,以内开挖四周环沟,沟宽4米;中间每隔3-4米开挖一条东西向横沟,沟宽3米、环沟和横沟深为0.8米,由进水侧(西)向排水侧(东)倾斜约0.5米。整个蟹池的水深可控制到1.3米左右。在排
First, crab pool construction of 4-6 acres of each pool, square or slightly rectangular, 4-5 meters away from the shore, to do the bait platform, digging around the trench around the trench width of 4 meters; the middle of every 3-4 meters excavation An east-west transverse groove with a groove width of 3 m and a depth of 0.8 m between the circumferential groove and the lateral groove is inclined by about 0.5 m from the inlet side (west side) to the drainage side (east). The depth of the crab pool can be controlled to 1.3 meters. In the row