Challenges of mining the first right-handed longwall panel in a new reserve block in Pittsburgh Seam

来源 :矿业科学技术学报:英文版 | 被引量 : 0次 | 上传用户:fy_laile
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
In this paper, the mining experience and challenges for the first right-handed longwall panel in the Pittsburgh Seam are introduced. The longwall headgate T-junction experienced very high face convergence(up to 61 cm), accompanied by roof sag, floor heave
其他文献
Cable bolts are sometimes used in low-seam coal mines to provide support in difficult ground conditions.This paper describes cable bolting solutions at two low-
In order to study pillar and overburden response to retreat mining, a ground control program was conducted at a Central Appalachian Mine. The program consisted
Rockburst represents a very dangerous phenomenon in deep underground mining in unfavourable conditions such as great depth,high horizontal stress,proximity of i
Coal seam destabilization inflicts damage to equipment,causes property loss and personnel casualties,and severely threatens mining safety and efficient producti
High-alkali species in coal are notorious for causing ash slagging and fouling incidents.In this paper,four high-alkali coals were individually subject to hydro
Coal permeability is a measure of the ability for fluids to flow through coal structures. It is one of the most important parameters affecting the gas drainage
This paper is to study the influence of composition,microstructure and pore characteristics on the rock mechanical properties.Five kinds of sandstone compositio
Bumps and other types of dynamic failure have been a persistent,worldwide problem in the underground coal mining industry,spanning decades.For example,in just f
Forecasting mineral commodity(MC)prices has been an important and difficult task traditionally addressed by econometric,stochastic-Gaussian and time series tech
通风管理系统的目的是保证由创造并且合并的地下的工人的健康和安全在矿通风系统的日常操作上组织了计划,过程和进程。通风管理程序的申请由审计,确认,和校正行动过程组成到:(1 )
期刊