风电作为可再生的洁净能源,是应对能源危机、解决环境污染的有效途径。甘肃酒泉二期风电场工程总装机4.95万千瓦,设计安装66台单机容量750千瓦风电机组。这项工程的建成投产,使中电国际在酒泉拥有的风电机组达到了200台,累计装机15万千瓦,这对加快甘肃省千万千瓦级风电基地的建设具有极其重要的意义。
As renewable and clean energy, wind power is an effective way to deal with energy crisis and solve environmental pollution. Gansu Jiuquan Phase II wind farm project total installed capacity of 49,500 kilowatts, design and installation of 66 stand-alone capacity of 750 kilowatts wind turbine. The completion of the project put into operation the total number of wind power generating units owned by CLP Power in Jiuquan reached 200 units and installed a total installed capacity of 150,000 kilowatts, which is of great significance for accelerating the construction of a 10-million-kilowatt level wind power base in Gansu Province.