论文部分内容阅读
介绍了对冷却塔大悬臂变长度施工平台的研究,解决了平台前桥与建筑物施工层高度平齐、平台前桥长度随建筑物半径的变化而变化的技术难点,实现了空中自助变幅以及后桥结构重心自动前移,能较好地适应现代冷却塔施工工艺的特殊要求。
This paper introduces the research on the cooling tower with large cantilever variable length construction platform, solves the technical difficulties that the height of the front bridge of the platform and the building is even and the length of the front bridge of the platform changes with the change of the building radius, and realizes the self- As well as the rear center of gravity of the structure automatically move forward, can better adapt to the special requirements of the modern cooling tower construction technology.