在榆林—济南输气管道工程陕晋段建设中,建设单位坚持“三同时”制度,并采取控制工程扰动范围、加强临时防护措施、注重工程治理措施等手段,较好地预防和控制了工程建设中的人为水土流失,取得了良好的效果。对工程建设中的水土流失防治措施进行了探讨总结,以期为其他项目人为水土流失防治提供借鉴。
In the construction of Shaanxi-Shanxi section of Yulin-Jinan Gas Pipeline Project, the construction unit insisted on the “three simultaneous” system and adopted measures to control the scope of project disturbance, strengthen temporary protective measures and pay attention to project management measures so as to prevent and control it well The man-made water and soil loss in the project construction has achieved good results. The prevention and cure measures for soil and water loss in the project construction are discussed and summarized in order to provide references for the prevention and control of man-made soil erosion in other projects.