综述如何做好建设工程造价结算审核的有效控制

来源 :工程经济 | 被引量 : 0次 | 上传用户:fmklsdfjds
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
工程造价的结算审核是合理确定工程造价的必要程序及重要手段。通过对预、结算进行全面、系统的检查和复核,及时纠正所存在的错误和问题,使之更加合理地确定工程造价,达到有效地控制工程造价的目的,促进建设单位对工程项目的资金有效管理,从而保证项目目标管理的实现。如何控制好建设工程造价结算控制应当受到应有的重视,向管理要效益,并且要加强建设工程造价结算审核的有效控制。 Project cost settlement audit is a reasonable process to determine the necessary cost of the project and an important means. Through the pre-settlement of a comprehensive and systematic inspection and review, and promptly correct the existing errors and problems so that it can more reasonably determine the project cost, to effectively control the project cost, and promote the construction unit of the project funds effective Management, so as to ensure the realization of the project goal management. How to control the construction project cost settlement control should be given due attention to the management to benefit, and to strengthen the construction project cost settlement audit of the effective control.
其他文献
近日,住房和城乡建设部发布公告,批准《绿色办公建筑评价标准》《建筑地面设计规范》为国家标准,两标准均自2014年5月1日起实施。《绿色办公建筑评价标准》编号为GB/T50908—
图A和图B展示的是中国古代贵族游行图。两件作品都是从著名的汉画像砖中拓印下来的。艺术家们首先把一张纸蒙在画像砖上。然后用颜料或墨把它拓印下来。 Figures A and B sh
[案例背景]“老师,我的铅笔不见了。”在上课铃声还没有响起之前,小瑞就跑来告状。“我刚才去上了个厕所,回来就发现铅笔不见了,问了周围的人都说没有看到。”小瑞气得脸通红
美《传染病》杂志第11卷第11期(1981年)报道罗彻斯特消息:由对青霉素敏感的绿色链球菌和肠球菌以外的D类链球菌引起的传染性心内膜炎用青霉素和链霉素作短期治疗,其效果与长
周末,大懒和同学一起到大山深处做拓展训练,带队的老师是三位有着丰富户外探险知识的“老驴”(老驴,经验丰富的驴友。)在大山深处,大懒同学私自离开队伍,其中一位老师不得不
村级组织作为农村最基层的组织,对深化农村改革,全面发展农村经济,起着重要的作用。最近,我们对德惠、磐石、辉南、桦甸、蛟河、舒兰等县16个乡镇的村级组织现状进行了调查,
改革开放以来,随着我国经济的飞速发展,城市建设的步伐也是日新月异,高楼大厦拔地而起。电梯作为不可缺少的垂直运输设备,在人们工作、生活中占有越来越重要的位置。人们在
本溪钢铁公司是我国大型钢铁联合企业,现有职工十万余人,家属二十五万人,分布于市区和郊区。1950年即在总医院内建立了结核病房,以后又于1951年和1954年相继建立结核病防治
干扰素(interferon IFN)在抗病毒感染中起重要的细胞和免疫调节作用。为评价干扰素生成在病毒性疾病中的意义,曾赏试测定患者血中IFN水平。但由于IFN系通过诱导病毒生化改变