对于施工企业来说,工程项目造价工作的全过程主要分为投标签约、过程跟踪、竣工结算三个阶段,各个环节互相呼应紧密相关,先行工作要服务到后续环节,后续环节要基于前期工作,且信息的完整性、连贯性需贯穿始末。同时,与技术、现场施工、采购等条线互为经纬,共同编织成工程管理的精美成果。上海市建安交通枢纽及商业开发项目(以下简称建安枢纽)位于愚园路常德路口,裙楼一至七层,高度37.2米,主楼八至十八层,总高度92.2米,建筑面
For construction enterprises, the whole process of project cost is mainly divided into three stages of bidding contract, process tracking, completion and settlement, each link closely related to each other, the first work to service to follow-up links, the follow-up links should be based on the previous work, And the integrity of the information, consistency must be through. At the same time, with the technology, on-site construction, procurement and other lines each other latitude and longitude, weaving together into the project management exquisite results. Shanghai Jian’an Transportation Hub and Commercial Development Project (hereinafter referred to Jian’an Junction) is located at Changde Intersection of Yuyuan Road, Podium 1-7, height 37.2 meters, main building 8-18 floors, total height 92.2 meters, building surface