论文部分内容阅读
本文介绍了在江都第三抽水站技术改造时,对水泵装置模型水轮机工况的能量性能试验研究情况,通过对各种反向发电运行方式的比较和经济分析,论证江都三站反向发电采用电机不变极运行方式的合理性。
This paper introduces the experimental study of the energy performance of the pump unit model turbine during the technological transformation of Jiangdu No.3 pumping station. By comparing and analyzing the operation modes of various reverse power generation, it is demonstrated that the reverse power generation of Jiangdu III Station uses the motor Unchangeable operation of the rationality of the pole.