论文部分内容阅读
广东珠三角成品油管道工程,是广东省政府和中国石油化工总公司的重点建设项目,仅经过广州番禺地段的80km中,据不完全统计,分别穿越河流、水塘、村庄等须采取水平定向钻穿越的地段就有50多处,一般埋深4~12m,最大达20多米。本文阐述了测量、物探、计算机新技术的应用,重点介绍了GPS RTK方法,列举了2个(单根和3根)深埋近间距管线的探测示例。
Guangdong Pearl River Delta oil pipeline project is the Guangdong Provincial Government and China Petrochemical Corporation’s key construction projects, only through the Guangzhou Panyu Lot 80km, according to incomplete statistics, respectively, across the river, reservoirs, villages, etc. to be taken horizontal orientation Drill through the lot there are more than 50, the general depth of 4 ~ 12m, the largest of more than 20 meters. This paper describes the application of measurement, geophysical and computer technologies. The GPS RTK method is introduced in detail, and two (single and three) deep buried close-spaced pipelines are enumerated.