Experimental Research for Block Stability on Dam Outer Slope under the Condition of Exceeding Standa

来源 :35th IAHR World Congress(第三十五届国际水利学大会) | 被引量 : 0次 | 上传用户:haoxiang123123123
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Using geotextile materials to lay on the downstream of dam before the exceeding standard flood can effectively delay the dam breach time and enhance the competence in fending off the dam breach risk.
其他文献
This paper presents a new method to immobilize sand in laboratory channels.The motivation for the present work was to develop a method that would: 1-not involve the use of harsh chemicals;and 2-ensure
Most often, continuous records of flow rates in rivers are based on so-called rating curves, which are simple stage-discharge functions calibrated using directly measured stage-discharge data called g
The vertical slot fishway is the most widely used type of the fishway, whose energy dissipation effect is abundant but flow pattern is complex.
With in the bioengineering framework, designing a non-erodible channel is a complex fluid dynamics problem as it involves knowing the drag exerted on the boundary, the drag exerted on the plant stems
Flows in rivers and inundated flood plains can often be considered as shallow, implying that the horizontal distribution of velocities is strongly influenced by local depth and roughness.
There is a need for high-resolution topographical data of riverine gravel-beds for hydraulic studies.To date, there is no readily affordable and deployable technique to collect these data, especially
According to the data from U.S.Bureau of Reclamation, when warning time of dam breach is more than 90 min, the mortality of downstream people is about 0.04%.When the time is less than 90 min and 15min
In 1965, Rajaratnam has put forwarded new concept that hydraulic jump is a kind of wall jet.According to mixed flow theory, Guo Zizhong holds that hydraulic jump is an attached wall jet affixed to the
The water flow on sluice downstream in tidal estuary is complicated, In this study, the multi-step stilling basins is experimentally investigated, taking the Wuniu new sluice project, Linhaipu Sluice,
Because of the frequently extreme climate, embankments break at times under the condition of exceeding standard flood.In this paper, a method of protecting embankment downstream slope by using geo-syn