Field Monitoring of Roof Strata and Longwall Overburden in Underground Coal Mines

来源 :33届国际采矿岩层控制会议(中国) | 被引量 : 0次 | 上传用户:zhiming0077
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  Monitoring of rock mass movement, stress change and seismic response has always been an important means to understand the rock mass reaction to mining activities.This paper summarises several field monitoring studies conducted recently by CSIRO in underground coal mines for various purposes including roadway stability, subsidence control, integrated coal-gas extraction, and prevention of dynamic weighting.These studies demonstrate the important role that geotechnical monitoring can play in mine safety, environmental control and optimal mining engineering.
其他文献
随着我国现代工业的发展,工业废水排放量日益增加,造成水体不同程度的污染,引发了许多环境问题。近年来,国家加强了对工业废液的污染控制和防治措施,加大了对水污染的治理工作,而国
  为了研究采动裂隙与岩体变形间的关系,分析了采动覆岩的破裂机理,在此基础上导出了采动裂隙发育宽度与岩体变形之间的关系式,并基于概率积分法简化了采动裂隙宽度计算公式,分
会议
岩石作为边坡、地下硐室围岩的介质,建筑物的基础,其力学特征及稳定性直接影响结构和建筑物的安全。通过引入损伤理论和Kachanov损伤演化规律,并结合耗散材料的不可逆热力学理
  基于相似理论,以水泥、河砂、添加剂(丁腈橡胶粉、聚苯乙烯颗粒)等为原料,构造煤岩相似材料.通过单轴压缩试验,获得水灰比、灰砂比、养护时间、添加剂体积比等配置参数对煤
会议
摘要:校史馆的建设,有利于学校不断积淀校园文化,帮助学校传承和发扬良好的办学传统,弘扬学校文化精神,提升校园文化品质。本文着重阐述温州市各学校校史馆建设的实践经验和做法,分析存在的问题,并思考可持续发展策略。  关键词:校史馆;建设;发展策略  中图分类号:G632.0 文献标识码:A 文章编号:1992-7711(2017)05-0003  校史馆是学校历史陈列馆、展览馆或博物馆的概称。校史馆是
本文通过对秦汉及古罗马时期"家庭"和"户"组织概念内涵的分析,从历史沿革角度指出家族本身的主体地位的取得并不来源于市民法(或国家法)的赋予,而是来源于家族的自然伦理性或
通过对晚清《湖南商事习惯报告书》附录中269篇行规进行分析,可以看出行规形成了一套制度体系,提供当时经济生活的主要秩序.行规主要涉及三大方面:行业组织管理、行业市场规
  岩石内部结构构成天然的体散斑,可以作为变形的信息载体。利用数字体散斑法工业CT结合测量了单轴压缩下红砂岩和煤岩样内部三维变形。利用工业CT对单轴加载不同阶段的岩样
水库岩溶渗漏是碳酸盐地区水库建设中常见的工程地质问题之一,其渗漏形式及渗漏量将直接影响到水电站的设计、施工及运营管理。影响水库渗漏的因素很多,诸如地形地貌、地层岩性
学位