论文部分内容阅读
在施工模拟设计基础上,从施工加载时间及顺序方面,详细介绍了京基金融中心关键部位的施工顺序及注意要点,对同类工程具有借鉴作用。
On the basis of construction simulation design, the construction sequence and key points of the key parts of Jingji Financial Center are introduced in detail from the loading time and order of construction, which can be used for reference for similar projects.