在风力发电厂的建设中,规划建设至风电场道路的盘山公路是影响风电场建设的重要因素之一.虽然道路的总投资在整个风电场的总投资中所占的比重并不大,但是道路选线及设计的合理性直接影响风电场的规划容量和整个风电场的投资,本文通过对国内现在流行的风电机组运输条件的比较,和对相关道路规范的研究,总结出了对于风电场内大件运输的特殊要求及技术参数.
In the construction of wind power plants, Panshan Road, which is planned and constructed to the wind farm road, is one of the important factors that affect the construction of wind farms. Although the total investment in roads accounts for a small proportion of the total investment in wind farms, The rationality of road alignment and design has a direct impact on the planning capacity of wind farms and the investment of the entire wind farm. Based on the comparison of the prevailing domestic wind turbine transport conditions and the study of relevant road codes, Large transport within the special requirements and technical parameters.