一、问题的提出安徽省滁河流域黄栗树水库,为一多年调节大型灌溉水库工程。水库及其灌区先后于1959年9月及1960年冬相继动工兴建。原设计灌溉保证率为75%,设计灌溉面积为34万亩,并按此规模进行施工。水库工程于1965年基本建成并蓄水灌溉。随着渠系配套工程的发展,灌区有效灌溉面积亦逐年扩大。但自1966至1968年,本流域连续三年大旱,水库灌区连年受旱
First, the issue raised Chu Chu River Basin in Anhui Province, for a large adjustment of large-scale irrigation reservoirs. The reservoir and its irrigation area successively started construction in September 1959 and the winter of 1960 successively. The original design of irrigation assurance rate of 75%, design irrigation area of 340,000 mu, and according to the scale of construction. Reservoir engineering was basically completed in 1965 and irrigated. With the development of canal supporting projects, the effective irrigated area of irrigation districts has also been expanded year by year. However, from 1966 to 1968, the drainage area suffered three consecutive years of severe drought, and the reservoir irrigation area suffered from drought in successive years