论文部分内容阅读
目前南方已到汛期,北方将到汛期,防汛工作,中央防汛总指挥部已经作了布置,各地都在贯徹执行。现在要特别提醒注意的,是对于群众性中小型水利工程的汛期防护工作。这类工程数量既多,分布又广,往往容易被忽视;新建工程一般还未经受洪水考验,其中有些是赶工抢修的,质量较差;如果防护不好,小工程也可能出大乱子,比如坝高十几公尺、蓄水几百万公方的小型水库,一旦溃决,就会造成很大的人为洪峰,招
At present, the south has reached the flood season, and the north will go to the flood season and flood control work. The central flood control headquarters has been arranged and all localities are implementing it. It is now especially reminded that the flood protection work for the mass small and medium-sized water conservancy projects should be carried out. Such projects are both large in number and widely distributed and often easily overlooked. Newly built projects have generally not yet been subjected to flood tests, some of them being rush repairs and poor quality ones. If the protection is not good, minor works may also be in great trouble. For example, Dam high ten meters, millions of square meters of water reservoir, once the collapse, it will cause a lot of man-made peak, move