(一)一九八八年水利工作获得全面丰收我省水利战线1988年全面超额完成了省政府目标责任书下达的各项任务。新增有效灌溉面积30.03万亩,超过计划任务20%。完成水土保持治理面积3567.1平方公里,超过计划任务19%。新增无水利设施基本农田71.18万亩,超过计划任务42%。解决了30万人的饮水困难。超过计划任务50%,较上年增长19%。小水电投产容量6396千瓦,超过计划任务60%;年发电量达到3.5亿千瓦小时,再创历史最高水平。水产品产量达到15234.8吨,超过计划任务27%。随着改革的不断深化,水利建设和生产经营效益明显提高。在水利建设上推行了以招标
(A) In 1988, water conservancy was fully harvested. The water front in our province fully overreached the tasks assigned by the provincial government’s responsibility statement in 1988. New effective irrigation area of 30.03 mu, more than 20% of planned tasks. Complete control of soil and water conservation area of 3567.1 square kilometers, 19% of planned tasks. New non-water conservancy facilities 71.18 million mu of basic farmland, more than 42% of planned tasks. Solve the drinking difficulties of 300,000 people. More than 50% of planned tasks, an increase of 19% over the previous year. Small hydropower capacity 6396 kilowatts, more than 60% of planned tasks; annual power generation reached 350 million kilowatts hours, another record high. Aquatic product output reached 15234.8 tons, more than 27% of planned tasks. With the continuous deepening of reform, the efficiency of water conservancy construction and production and management has been obviously raised. Water conservancy construction in the implementation of the tender