论文部分内容阅读
禹州4×30万 kW 电厂是河南省重点工程,对缓解华中地区电力供应紧张局势有着十分重要的意义。白沙水库作为禹州电厂的唯一水源.其取水口处的泥沙资料将作为电厂补充水处理系统设计的主要依据。为使该电厂的正常引水得到充分保证,需进行水库泥沙专项研究。河海大学、武汉水利电力大学和黄河水利科学研究院等单位参加了项目的投标。在激烈
Yuzhou 4 × 300,000 kW power plant in Henan Province is a key project to ease the tension in the power supply in central China has a very important significance. Baisha Reservoir is the only source of water for Yuzhou Power Plant, and the sediment information at its intake will be the main basis for the design of the power plant supplementary water treatment system. In order to fully ensure the normal diversion of the power plant, special research on reservoir sediment is required. Hohai University, Wuhan University of Hydraulic and Electric Power and the Yellow River Hydraulic Research Institute and other units participated in the project bidding. Intense