论文部分内容阅读
我们电解车间是全厂铜系统的最后一道工序,主要产品是电铜.一九七八年开展质量月活动以来,“坚持质量第一”的思想不断深入人心,车间各项工作逐步走上以质量为中心的轨道.特别是一九八○年初,我们学习了兄弟行业和兄弟厂家的先进经验,结合自己的实际,推行“全面质量管理”(TQC),成立了车间QC小组,进一步从思想上、组织上、制度上把质量管理落到实处,经过努力,电铜的化学成份、外形质量和主要技术经济指标都赶上和超过了国内先
Our Electrolytic Workshop is the last process of the whole plant copper system, the main product is electro-copper. Since the quality month activity was carried out in 1978, the thought of “insisting on quality first” has been deeply rooted in the hearts of the people. Especially in the early 1980s, we learned the advanced experience of brother industry and brother manufacturers and implemented “Total Quality Management” (TQC) in combination with our own actual conditions to set up a workshop QC team to further develop our thinking On the organization, the system of quality management to the letter, through the efforts of electro-copper chemical composition, appearance and quality of the major technical and economic indicators have caught up with and surpassed the domestic first