论文部分内容阅读
赞比亚卡里巴北岸水电站扩机工程是笔者所在公司在海外完工的第一个大型的EPC水电项目,同时也是集团公司示范项目。赞比亚政府、业主和业主代表对项目的成功完成给予了高度评价。该工程位于非洲赞比亚和津巴布韦两国交界的赞比亚西河中游的卡里巴峡谷内,是在电站原有基础上新增两台180MW机组,主要工程包括进水口、引水隧洞、地下扩挖厂房和尾水隧洞、尾水渠等土建设计和施工,以及闸门结构和机电设备的设计、供货、安装等工作。
The expansion project of the Karibaba North Shore Hydropower Station in Zambia is the first major EPC hydropower project completed by the author’s company overseas and is also a demonstration project of the group company. The Zambian government, owners and owner representatives spoke highly of the successful completion of the project. The project is located in the Kariba Valley in the middle reaches of West River in Zambia at the junction of Africa Zambia and Zimbabwe. It is to add two 180MW units on the basis of the original power station. The main projects include water intake, diversion tunnel, underground expansion plant and tail Water tunnel, tailrace and other civil engineering design and construction, as well as gate structure and mechanical and electrical equipment design, supply, installation and so on.