兰州铁路局针对在实施“燃油低烧”过程中采用电加热存在的“油库加热设备功率大(高达295kW),增加电能消耗和成本支出”以及“存在安全隐患”的问题,结合拟改油库的实际,采用了就近利用锅炉热源,成功地实施了兰州车辆修配段、迎水桥机务段的“燃油低烧”改造工程,运行二年来,安全可靠,效益突出,为北方路局实施类似工程积累了可借鉴之经验。
Lanzhou Railway Bureau in response to the implementation of “fuel burn ” in the process of using electric heating “oil tank heating equipment power (up to 295kW), increase power consumption and cost ” and “there is a security risk Combining with the reality of oil depot to be changed, the project has adopted the heat source of the nearby boiler and successfully implemented the ”low fuel burn" renovation project of Lanzhou Vehicle Repair Section and Yingshui Bridge Maintenance Section. Since its operation for two years, it has been safe and reliable with prominent benefits for the north Road Bureau has implemented similar projects have accumulated experience can learn from.