Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland

来源 :结构与土木工程前沿 | 被引量 : 0次 | 上传用户:zkw_2209
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The 130m high Punt dal Gall dam is located at the Swiss-Italian border in the South-east part of Switzerland and was completed in 1969.The dam is founded on highly folded and partially crushed dolomite and limestone formations.A grout curtain with an area of 120,000m2 was provided for controlling seepage.For the monitoring of the dam deformations five inverted pendulums were installed in the dam and three in the rock foundation of the right abutment outside of the dam.For a seasonal water level fluctuation in the reservoir of about 60 m the maximum amplitude of the radial displacement is 25 mm,which includes both the effects of the water load and temperature effects.Furthermore a comprehensive geodetic network was established,57 joint meters were installed and cracks in the crest gallery are monitored by crack meters.There are also thermometers,piczometers and rocmeters.Springs at the left and fight banks of the dam are monitored and chemical analyses of the seepage water and springs are performed regularly.The dam is equipped with strong motion instruments and several near-field earthquakes have been recorded in the past.The paper describes the long-term safety monitoring of this 42 years old arch dam.A short description of the Swiss practice in dam safety monitoring and emergency planning is also given.
其他文献
在基层组织建设年活动中,河北省秦皇岛市北戴河区科学确定“幸福北戴河”指标体系数据目标值,组织各级干部下基层、办实事、促发展。  发展富民,让群众更得实惠。建立了“农村 农业龙头企业”、“强村 弱村”、“强企 弱村”、“党组织 农合组织”四类“捆绑型”农村党组织。整合优势资源大力发展乡村旅游、花卉苗木、设施农业等高效富民产业。针对农村群众的技术需求,充分发挥党组织的统筹协调作用,通过学历教育、专家授
医院科技档案具有非常强的专业性,但是由于医学知识的不断更新以及医疗的改革不断的深化,以至于科技档案方面的管理工作也需要通过系统化、制度化、信息化来逐渐将渠道扩宽,
传统意义上的防火墙随着现代网络的发展在很多方面已经不能适应新的要求。本文详细探讨一种基于IPSec虚拟专用网的防火墙设计和应用技术,它不仅适应性强,而且还继承了传统防火墙的
7月26日辽宁沈大高速公路一大队于福来大队长等二人从上海一下飞机,就匆匆打的来到江苏海安.原来……
Based on the aerodynamic shape and structural form of the blade are fixed,a mathematical model of optimization design for wind turbine blade is established.The
Long-term deformations of rockfill dams can be related to the type of dam,the pre-compaction achieved during the construction of the dam,the history of loading
This paper presents the application of a methodology which can be used to assess arch dam foundation stability,using the discrete element method (DEM) and the c
The three-dimensional mode-deformable discrete element method (3MDEM) is an extended distinct element approach under the assumptions of small strain,finite disp
The stability of a gravity dam against sliding along deep-seated weak planes is a universal and important problem encountered in the construction of dams.There
Ground motion intensity measures are usually used to predict the earthquake-induced displacements in earth dams,soil slopes and soil structures.In this study,th