论文部分内容阅读
根据火电厂在建设过程中极易产生水土流失的情况,探讨了在编制该类建设项目水土保持方案时应特别注重的诸如厂区基本情况介绍、工程占地分析、土石方流向与平衡等几方面的问题,提出了火电厂厂区与储灰场场区的水土保持措施体系,供今后编制该类建设项目水土保持方案时参考。
According to the situation that the thermal power plant can easily produce soil and water loss in the process of construction, this paper discusses the basic information such as factory area introduction, project occupation analysis, earth-rock direction and balance, etc. that should be paid special attention in compiling the soil and water conservation plan of this type of construction project Problems, put forward the thermal power plant and ash storage yard area soil and water conservation measures system for the preparation of such projects in future soil and water conservation programs reference.