论文部分内容阅读
核安全法草案于2016年10月31日提请十二届全国人大常委会第二十四次会议审议。草案对核设施与核材料安全、核事故应急准备与响应、信息公开与公众参与以及监督检查等管理制度作了全面规定,并在核设施选址和设计建造、核设施与核材料安全许可、涉核单位核安全报告、放射性废物管理与处置以及核设施退役等关键环节构筑了一整套完整的、相互衔接的安全制度链。在中国核能大发展的背景下制定
On October 31, 2016, the draft nuclear safety law was submitted for consideration at the 24th meeting of the 12th NPC Standing Committee. The draft comprehensively provides for such management systems as the safety of nuclear facilities and nuclear materials, emergency preparedness and response to nuclear accidents, information disclosure and public participation, and supervision and inspection. In addition, the draft addresses the requirements for siting and design of nuclear facilities, permitting the safety of nuclear facilities and nuclear materials, Nuclear units nuclear safety report, radioactive waste management and disposal of nuclear facilities and decommissioning and other key links to build a complete set of interconnected security system chain. Under the background of the great development of China’s nuclear energy